November 26, 2026 — Weekly Tower Safety Bulletin. A historical Nebraska FACE investigation published in 2002 documented a fatality when a wire rope used to lift coaxial cable broke, allowing material to strike a tower supervisor who was tied off. Read the investigation. This is an evergreen lesson, not a newly reported accident. No specific new incident is asserted.

The lesson: fall protection is not load protection

A harness cannot protect a worker from the path of a falling or swinging load. Before lifting, identify where the load could travel if a connection, rope or supporting component fails. Keep workers out of that exposure wherever practicable.

Critical checks before the lift

Rigging: verify load weight, rated capacities in the actual configuration, attachment points, rope condition, manufacturer instructions and the approved lift plan. Establish a designated signal person and stop movement if communication fails. Never improvise personnel lifting with material-only equipment.

Structure and dropped objects: verify engineering approval for temporary loads and attachments, establish a controlled exclusion zone, secure tools and prevent simultaneous work beneath suspended loads. Stop if actual conditions differ from the plan.

Falls and rescue: maintain continuous compatible fall protection, verify anchorage and clearance, and confirm a site-specific rescue plan, trained rescuers, accessible equipment and emergency communications before climbing.

RF and electrical: coordinate transmitter status with all relevant operators, verify required power reductions or shutdowns, use appropriate RF monitoring and establish electrical clearances and isolation as applicable. An RF monitor is a warning device, not a substitute for exposure control.

Weather and subcontractors: establish wind and lightning stop criteria based on equipment limits and site conditions. Confirm every subcontractor understands the lift sequence, exclusion zones, responsibilities and stop-work triggers. Reassess after changes.

Regulatory requirements versus industry practice

Applicable OSHA requirements depend on the activity and equipment. Review 29 CFR 1926.251 (rigging) and OSHA tower construction inspection guidance; the latter is enforcement guidance, not a standalone regulation. Maintenance may fall under Part 1910. FCC RF exposure requirements are addressed in 47 CFR 1.1310. ANSI/ASSP A10.48 and ANSI/TIA-322 are consensus standards relevant to tower work and construction loading; verify applicable editions and contractual requirements. Their full text and current revisions were not independently reviewed for this bulletin.

Additional resources: OSHA tower investigations and Texas DWC tower safety guidance, updated October 2, 2025.

Toolbox question

If the load or rigging fails right now, who is in its potential path? If the crew cannot answer, stop and revise the plan before lifting.